Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Black, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-10-LF)

  • Unit: 1000 g Shipping Weight: 1000 g Stock Available: 1 unit Sold:2unit

Discount Level

Buy More for Big Saving

The more quantity(units) you buy, the more discount you get.

  • 1-4 units
    No discount
  • 5-9 units
    5% OFF
  • 10-14 units
    10% OFF
  • 15+ units
    20% OFF

Tips: Order 15+ diferent items or 15+ units of the same item to achieve a 20% discount level . lt will help you save big.

0

0 15+

Buy more 5 units, enjoy 5% discount on every item

Delivers To:

Shipping Time:

  • Share with
    Pinterest
    Instagram
    vkontakte
    WhatsApp
    Mail
  • Specification
  • Description
  • Size Conversion
  • Shipping & Returns

Customer Reviews

Write a customer review Share your thoughts with other customers
  • TOP

Search by Image

Search Nbeads with an image instead of text. Try dragging an image here.

  • Upload an image
  • Paste image URL

1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm

2. The size of the image should be less than 5M!

3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 5120pixes.

1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm

2. The size of the image should be less than 5M!

3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 5120pixes.

Uploading File